Downlands Water Storage UK Ltd
  • Home
  • Solutions
    • Products
    • Trussed Roof Tanks
    • Uncovered Tanks
    • Floating Roof Tanks
    • KlipJets
    • Fittings and Accessories
  • Case Studies
    • Manufacturer Case Studies
    • UN Marshall Islands
    • Aramiro Ahu Whenua
    • Titirangi Golf Club
    • Mount Golf Club
    • Murray and Ruth Miers
    • Kiwifruit Orchard
    • Sisam and Sons
    • Malvin Welch
  • About Us
  • Contact Us
  • More
    • Home
    • Solutions
      • Products
      • Trussed Roof Tanks
      • Uncovered Tanks
      • Floating Roof Tanks
      • KlipJets
      • Fittings and Accessories
    • Case Studies
      • Manufacturer Case Studies
      • UN Marshall Islands
      • Aramiro Ahu Whenua
      • Titirangi Golf Club
      • Mount Golf Club
      • Murray and Ruth Miers
      • Kiwifruit Orchard
      • Sisam and Sons
      • Malvin Welch
    • About Us
    • Contact Us
Downlands Water Storage UK Ltd
  • Home
  • Solutions
    • Products
    • Trussed Roof Tanks
    • Uncovered Tanks
    • Floating Roof Tanks
    • KlipJets
    • Fittings and Accessories
  • Case Studies
    • Manufacturer Case Studies
    • UN Marshall Islands
    • Aramiro Ahu Whenua
    • Titirangi Golf Club
    • Mount Golf Club
    • Murray and Ruth Miers
    • Kiwifruit Orchard
    • Sisam and Sons
    • Malvin Welch
  • About Us
  • Contact Us

Murray & Ruth Miers

The Challenge  


Murray and Ruth Miers relied on an ageing open irrigation pond to provide water for their kiwifruit orchard during dry periods and for critical frost protection. By 2021, the pond had become a safety risk and required replacement.

The only suitable location for the new storage system was the site of the existing pond, which required careful decommissioning and civil preparation because it was located below sea level.

The Solution  


KlipTank supplied and installed a custom 800m³ roofed tank to replace Murray and Ruth Miers’ open irrigation pond, providing storage for orchard irrigation and frost protection.


KlipTank also developed the rainwater-harvesting roof for this installation. It collects rainfall through a filtration system that removes leaf matter, while protecting stored water from sunlight, debris, birds and pests.

Advantages & Benefits of the solution  


Once the site was prepared, the tank was installed in just one week. The complete project, including fabrication, site preparation and installation, was delivered within three months and completed ahead of the important spring frost period.

The solution provided:

A safer alternative to the former open irrigation pond.

Reliable stored water for irrigation and frost protection.

Rapid installation once civil preparation was complete.

Improved water protection through enclosed, filtered storage.

Additional rainwater capture to support more sustainable water management.

The result was a safer, more resilient water-storage system supporting the long-term productivity and protection of the orchard.

This manufacturer case study illustrates a KlipTank project

Return to Case Studies
contact us

2026 Downlands Water Solutions is a trading name of Downlands Water Storage UK Ltd, registered company 17010397 (privacy policy)

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept