Downlands Water Storage UK Ltd
  • Home
  • Solutions
    • Products
    • Trussed Roof Tanks
    • Uncovered Tanks
    • Floating Roof Tanks
    • KlipJets
    • Fittings and Accessories
  • Case Studies
    • Manufacturer Case Studies
    • UN Marshall Islands
    • Aramiro Ahu Whenua
    • Titirangi Golf Club
    • Mount Golf Club
    • Murray and Ruth Miers
    • Kiwifruit Orchard
    • Sisam and Sons
    • Malvin Welch
  • About Us
  • Contact Us
  • More
    • Home
    • Solutions
      • Products
      • Trussed Roof Tanks
      • Uncovered Tanks
      • Floating Roof Tanks
      • KlipJets
      • Fittings and Accessories
    • Case Studies
      • Manufacturer Case Studies
      • UN Marshall Islands
      • Aramiro Ahu Whenua
      • Titirangi Golf Club
      • Mount Golf Club
      • Murray and Ruth Miers
      • Kiwifruit Orchard
      • Sisam and Sons
      • Malvin Welch
    • About Us
    • Contact Us
Downlands Water Storage UK Ltd
  • Home
  • Solutions
    • Products
    • Trussed Roof Tanks
    • Uncovered Tanks
    • Floating Roof Tanks
    • KlipJets
    • Fittings and Accessories
  • Case Studies
    • Manufacturer Case Studies
    • UN Marshall Islands
    • Aramiro Ahu Whenua
    • Titirangi Golf Club
    • Mount Golf Club
    • Murray and Ruth Miers
    • Kiwifruit Orchard
    • Sisam and Sons
    • Malvin Welch
  • About Us
  • Contact Us

Malvin Welch

The Challenge   


Operating a 400-hectare dairy farm with 860 cows, Malvin Welch needed to improve effluent management and meet environmental requirements.
The existing system provided only two to four days of storage, requiring near-constant irrigation and leaving little operational flexibility. Site conditions, including the local water table, also meant that above-ground storage was required.

The Solution   


KlipTank installed two uncovered above-ground effluent tanks for Malvin Welch, completing the first in November 2023 and the second in November 2024. Together, they provide 5 million litres of usable storage, giving the farm more than 90 days of effluent storage capacity.

One tank stores green water close to the dairy shed, while the second is positioned further away to increase the available irrigation application area. The tanks work alongside the farm’s feed-pad, flood-wash and solids-separation systems.

Advantages & Benefits of the solution    


The high-capacity above-ground solution provided significant storage within a relatively compact footprint, avoiding the limitations associated with the site’s water-table conditions.
The solution delivered:
Over 90 days of effluent storage, compared with the previous two-to-four-day capacity.
Reduced pressure for daily irrigation and improved operational flexibility.
Above-ground storage suited to the site conditions.
Greater irrigation application coverage through the two-tank layout.
Improved environmental compliance, with the farm’s upgraded system positively received following audit.
Capacity to support future expansion, with a third tank under consideration. The result is a compliant, practical effluent-management system that provides the farm with greater control, resilience and confidence for the future.

This manufacturer case study illustrates a KlipTank project

Return to Case Studies
contact us

2026 Downlands Water Solutions is a trading name of Downlands Water Storage UK Ltd, registered company 17010397 (privacy policy)